Plans for Oxenhall
Our team at Oxenhall will be increasing the height of the towpath on the wild side to improve the water levels below Lock two.
A new sluice gate will be also installed to improve the water control.
House Lock is due a visit by boat so we can ensure all is well.
The stop lock at the top of House Lock is going to be replaced, so work will be undertaken to enable the replacement of the planks in the stop lock.
The team are also going to move across the road to clear the towpath that the landowner has allowed us to access.